PHENIX Muon Subsystem Notes
Material in these notes are sometimes PRELIMINARY and are placed here to facilitate rapid communication about work in progress within the entire Muon Arms collaboration and to solicit CONSTRUCTIVE criticism of the ongoing work described herein. Consequently, results presented here are often not final and may not be a fair representation of what will ultimately be obtained.
Note on the files: Those marked postscript ftp are files which, when choosen, will FTP a postscript file to your machine which you will then have to either print or use a viewer to see. Otherwise the files are immediately visiable when choosen.
- Simulation Studies of Tracking Technoligies, Melynda Brooks
(Phenix-muon-94-1). (postscript ftp)
- A Few Words about Discrimination Analysis, Paul Stankus
(Phenix-muon-94-3). (postscript ftp)
- Simulation studies of absorbers and arms 1 & 2, Melynda Brooks
(Phenix-muon-95-1), revised: 3 May 1995 (to add titles). (postscript ftp)
- Spin Physics with Inclusive Muon Production, Naohito Saito and J.M. Moss
(Phenix-muon-95-2), submitted: 21 April 1995. (postscript ftp)
- Alignment simulation information, Melynda Brooks
(Phenix-muon-95-3), submitted: 21 April 1995; revised: 3 May 1995 (to add titles). (postscript ftp)
- Luminosity Monitor and Polarimeter at RHIC , Naohito Saito
(Phenix-muon-95-4), submitted: 21 April 1995. (postscript ftp)
- A Conceptual Design of the South Muon Arm Magnet, W. Wayne Kinnison, et al.,
(Phenix-muon-95-5), submitted: 27 April 1995.
- A first look at rates in the South Muon Arm Muon Identifier, P. L. McGaughey,
(Phenix-muon-96-6), submitted: 25 April 1995.
- Backgrounds from Random Pions and Muons from Pion Decay at sqrt-s = 200 GeV, J. M. Moss,
(Phenix-muon-95-7), submitted: 27 April 1995.
- Current Status of the Simulation Study of Muon Tracking System, Naohito Saito and M. L. Brooks
(Phenix-muon-95-8), submitted 4 May 1995; revised 11 May 1995. (postscript ftp)
- Alignment
Requirements for the Muon Tracker, D.M. Lee
(Phenix-muon-95-9), submitted: 4 May 1995; revised: 15 May 1995.
- Preliminary Results For Muon Discrimination, Saskia Mioduszewski
(Phenix-muon-95-10), submitted 16 May 1995.
- Muon Alignment Requirements, M. L. Brooks
(Phenix-muon-95-11), submitted 16 May 1995, revised 16 June 1995.
- Preliminary Results of Muon Level-1 Trigger Rates, A. Mohanty, et al
(Phenix-muon-95-12), submitted 19 May 1995.
- Electronics Requirements for the CSC Chambers, D.M. Lee
(Phenix-muon-95-13), submitted 10 August 1995, revised 16 August 1995.
- Mu/Pi Discrimination with the Muon
Identifier, Gus Pettit and Xiochun He
(Phenix-muon-95-14), submitted 10 August 1995.
-
Space Frame Design at Station 2 for the PHENIX Muon Detector,
Zukun Chen
(Phenix-muon-95-15), submitted 11 August 1995.
-
PHENIX Muon Tracking Calibration Requirements, M.L. Brooks
(Phenix-muon-95-16), submitted: 23 August 1995.
-
Design Criteria For the Muon Tracker Electronics, D.M. Lee and
W. Sondheim
(Phenix-muon-95-17), submitted: 14 September 1995.
-
PHENIX Muon Identifier FEE Specifications, Ken Read
(Phenix-muon-95-18), submitted: 26 September 1995; revised: 1 August 1996.
- Trigger Rate Studies of the Muon Identifier Using Anode Wire Readouts, Gus Petitt and Xiochun He
(Phenix-muon-95-19), submitted: 2 November 1995.
- Mu/Pi Discrimination with the Muon Identifier, Gus Petitt and Xiochun He
(Phenix-muon-95-20), submitted: 8 November 1995.
- Determining Optimal Position of South Arm Station #2 Chambers, P. L. McGaughey
(Phenix-muon-95-21), submitted: 8 November 1995.
- Lorentz Angle Effect in Gas Mixtures, B.V. Dinesh
(Phenix-muon-95-22), submitted: 20 November 1995.
- Generating Beam Gas Events Based On Limiting Fragmentation, S. Mioduszewski
(Phenix-muon-95-23), submitted: 21 November 1995.
- Constructing and Testing the Limited Streamer Tube with Smaller Cross Section, Tian Wei, Mao Yajun, Wan Yude, Sun Zuxun, Zhou Shuhua
(Phenix-muon-96-1), submitted: 26 January 1996.
- Simulation of PHENIX Muon CSCs, Melynda Brooks
(Phenix-muon-96-2), submitted: 29 February 1996.
- Limits on Upsilon Mass Resolutions in PHENIX Muon Arms, Melynda Brooks
(Phenix-muon-96-3), submitted: 29 February 1996.
- A
Proposal for a Level 1 Trigger For the Muon Arms, W. Wayne Kinnison
(Phenix-muon-96-4), submitted: 2 May 1996.
- Calculation of Capacitances, Induced Charges on Cathodes, and Gain Variation in PHENIX Cathode Strip Readout Chambers , B.V. Dinesh
(Phenix-muon-96-5), submitted: 15 May 1996.
- Summary of Meeting at Oak Ridge National Laboratory on Muon Tracker Electronics on May 16, 1996, compiled by D.M. Lee and W. Sondheim
(Phenix-muon-96-6), submitted: 3 June, 1996.
- Muon Tracker Data Stream, D.M. Lee
(Phenix-muon-96-7), submitted: 28 June, 1996.
- Stress
Calcuations and Tests of Wires Used in Muon Tracking Cathode Strip Chambers, Bill Blumenthal and Walter Sondheim
(Phenix-muon-96-8), submitted: 13 June 1996.
- Muon Identifier Assembly, Ken Read
(Phenix-muon-96-9), submitted: 21 August 1996; revised: 14 March 1997.
- PHENIX Muon DAQ System, Elham Nikanjam
(Phenix-muon-96-10), submitted: 16 August 1996. (in PDF format)
- Report of Muon ID chamber R&D at Kyoto, Y. Nakada and Y. Mao
(Phenix-muon-96-11), submitted: 13 August 1996.
- Past Experience with Iarocci Tubes by Selected Experiments, K. Read and S. Held
(Phenix-muon-96-12), submitted: 16 September 1996.
- Report of Chinese Muon ID Tubes, Y. Nakada, H. Enyo, K. Imai and Y. Mao
(Phenix-muon-96-13), submitted: 9 November 1996.
- PHENIX Muon Tracking Performance with BeO Nosecones, M. L. Brooks
(Phenix-muon-96-14), submitted: 13 December 1996; revised: 15 January 1997.
- Muon ID Gas R&D, Yu. Efremeko, Yu. Kamyshkov, V. Cianciolo and S. Held
(Phenix-muon-97-1), submitted: 18 April 1997.
- Physics Performance Comparison Between 5 and 6 Muon Identifier Gaps, W.W. Kinnison
(Phenix-muon-97-2), submitted: DRAFT 27 May 1997.
- Simulated MuID Performance With or Without Gap 6 Installed, K. Read
(Phenix-muon-97-3), submitted: 27 May 1997.
- Muon Tracking Drawing Numbers, Walter Sondheim
(Phenix-muon-97-4), submitted: 23 May 1997.
- A Description of the PHENIX Muon Tracking Survey System, M.L. Brooks
(Phenix-muon-97-5), submitted: 28 May 1997.
- Performance of PHENIX Muon CSCs with Different Chamber Gases, M.L. Brooks
(Phenix-muon-97-6), submitted: 28 May 1997.
- Additional Shielding Studies in the Vicinity of Station 1, D.M. Lee
(Phenix-muon-98-1), submitted: 15 September 1998.
to PHENIX Home Page
to PHENIX Muon Subsystem Home Page
Curator: Webmaster, Los Alamos National Laboratory, Los Alamos, NM 87545, USA
Last Updated: Wed, Sep 16, 1998 17:16