FVTX
Home Page
Operation/Maintenance/Commissioning
Project Management
Meetings and Presentations
Software
Database
Wedge Hardware
DAQ
BNL Assembly
Power and Grounding
Mechanics
Integration
Contact Info
FVTX Operations, Maintenance and Commissioning
Operations Info:
FVTX Expert Shifters:
FVTX Experts Shift List
FVTX Wiki Standing Order Instructions, etc.
Monitoring the Detector:
Wedge Status vs. Time
(check for changes in the state of the detector over time)
Online Monitoring Output
(check detailed output of detector/run)
Calibration Results Page
Bias Voltage and Thermocouple Monitoring Page
Radiation Monitor Output
Trouble-Shooting:
Troubleshooting - Run-12
Shutdown Work:
Run 14 Known Detector Problems
Summer 2013 shutdown work
Run 13 Commissioning Checklist
Summer 2012 Shutdown Work List
Current status of FVTX Detector Checkout
(2012 pre-shutdown)
All BNL Assembly Workers in
Physics
must Read and Sign:
Experimental Safety Review
All BNL Assembly Workers in
Chemistry
must Fulfill Chemistry Training
requirements
Sign up for, view On-site workers for Shutdown
Miscellaneous:
Who is at the BNL house?
Last update by
Melynda Brooks