Fabrication & Integration Milestones (continued)
09/99-01/00 Assemble and test S-Arm cathodes FEM
11/10/99 Begin S-Arm cathodes FEM installation in assembly area
02/14/00 S-Arm cathodes FEMs installed
S-Arm ready for roll-in
Previous slide
Next slide
Back to first slide
View graphic version