Fabrication & Integration Milestones
10/01/98 CPA ASIC production
06/17/99 Cathodes FEM design integration and tests completed
- Start fab’ing prod’n parts for S-Arm cathodes
- After 04/01/99 (JFY boundary)
05/99-09/99 Prepare cathodes FEM test stations
08/05/99 Begin FEE infrastructure installation
- after detector installation complete