MVD Computing status
(continued)
-
Simulation...
-
Offline...
-
ONCS
- Questionnaire
Not done.
With the January 97 MCM prototypes, we can operate without ONCS support
through the fall '97 beam test (if we should participate).
For the MCMs that we expect to have in fall 97, we need the full Phenix
environment, including DCM interfaces, DCMs, timing and control
modules, Arcnet and Glink communications, an event builder etc, and this will
include software components to be obtained from ONCS.
- Ancillary control requirements
- monitoring a few dozen temperatures, pressures, flows
- controlling 3 temperature loops
- monitoring a few HV channels
Emergency shutoff done in hardware
- Who:
the usual suspects