I took this list of dates from an
email message
sent by Bill Zajc to the
phenix-comp-l
mailing list on 25-Sept 1997.
data | task |
15-Oct-1997 | PHASE 0 Completion of STAF Transition (all systems in STAF, all "raw" tables spec-ed) |
15-Dec-1997 | Preliminary response packages for all sub-systems written (i.e., simulates ADC's, leading/trailing edges, etc. starting from PISA results read into STAF). |
15-Feb-1998 | Raw tape simulators in production mode (PISA output in, fake data tape out, with simulation of noise, cross-talk, slewing, dead-channels driven by STAF tables/controls.) |
15-Mar-1998 | PASS 0 (calibration pass) in production mode |
15-Apr-1998 | PASS 1 (reconstruction pass) in production mode (should also include preliminary PID code) |
15-May-1998 | "Physics analyses in production" |
22-June-1998 | Present results at Ames |
Here is a proof that milestones are not worth the paper they are written on.