MVD Installation Procedure

presented by

Jan Boissevain


Main Slides:



  1. Lift in Retracted Position
  2. Install N/S Guard Rails
  3. Add MVD Installation Fixture
  4. Place MVD into Installation Fixture
  5. Add E/W Guard Rails
  6. Raise Lift to Intermediate Position
  7. Cable conduit shown
  8. Install cables
  9. Install Cooling Air Adapters
  10. Raise Lift to Beam Height
  11. Show Beampipe
  12. MVD Closed at Beam Height
  13. View Looking Down Between Nosecone and MVD