Installation Procedure
- Place MVD Installation Fixture on Lift Table
- Place MVD into the Installation Fixture
- Clam shell the MVD open
- Raise the Lift Table such that the endplates still clear the Nosecones
- Connect cable bundle, air cooling system 2, and liquid cooling
line strain relief brackets to Installation Fixture
- Install all MVD cables, MCM air cooling adapters, air cooling system
2 hoses, and liquid cooling lines
- Put MVD Mounting Assembly pistons in retracted position
- Raise the Lift Table to be close to the correct mounting positon
- Use the fine XYZ Installation Fixture adjustments to properly
place the MVD into position
- Release the two lower retracted mounting assembly pistons
- MVD pivots now in the correct positon
- Close clam shell
- Release upper mounting assembly pistons
- MVD now supported by its mounting system
- Disconnect the installation fixture
- Transfer the strain relief brackets to the central magnet locations
- Lower the lift table to an intermediate position
- Connect the MCM air cooling hoses to the adapters
- MVD installation complete