A few details on the LED QA assembly


Here is a sketch of the NIM electronics setup (postscript version):


Here are the delay curves used to set the level-1 delay (postscript here). The delay time is measured from the output of the fanin/fanout module to the "DEL" out signal out of the 222 Gate generator which then goes to the MCM.


last update: 15-Dec-2000
John Sullivan (sullivan@lanl.gov)