- plumbing:
- put together the 2nd box
- braze 4 radiators together (make manifold for parallel flow)
- order extender boxes (3)
- put fittings on dehumidifier coils (swage)
- mount fluid level sensor and fluid valve
- put one box back in big mockup
- decide if 2nd cooler is needed in primary cooling loop.
- measure final operating temperatures and humidities for the
cages, plenum
- finalize drawings and send to UCR for manufacture
- have 3 sets of parts made
- re-do the 1st box
- make 3rd box for BNL cleantent operation.
- order: radiators, fluid sensor
- have made: box, copper coils, drip pan
- check: 3rd fluid valve?
- for BNL:
- buy elbows, pipe
- copy piping (decide on valves)
- check if enough pipe insulation remains
- brackets from UCR
- sensors:
- (re)build the 6 TxFx (air) sensors for 14-pin connectors
- (re)build 4 Tx sensors (fluid)
- build 8 T11-T18 fluid sensors for chiller monitoring.
Copper and swagelock.
- build new sensor distribution boards
- make final cables
- control:
- upgrade the SUN
- install EPICS
- talk to existing crate
- talk to new processor/crate
- talk to i/o modules
- use i/o modules to read sensors
- talk to RS232 ports
- use i/o modules to control LV. [need tomake a ribbon, or a board?])
Last update 18 aug 99 - HvH