PHENIX Muon Subsystem Talks
Talks Presented About PHENIX Muon Subsystem
Material in these talks are sometimes PRELIMINARY and are placed here to facilitate rapid communication about work in progress within the entire Muon Arms collaboration and to solicit CONSTRUCTIVE criticism of the ongoing work described herein. Consequently, results presented here are often not final and may not be a fair representation of what will ultimately be obtained.
Note on the files: Those which are marked as PDF are in PDF format. Otherwise, they are in HTML format.
- Muon Arm Cost and Schedule, by W. Wayne Kinnison (LANL), PHENIX TAC Follow-up Meeting, Brookhaven National Laboratory, November 18-19, 1998. PDF
- Calibration and Monitoring - Online Needs, by Glenn R. Young (ORNL), PHENIX Online Meeting, Brookhaven National Laboratory, November 11, 1998.
- Muon Tracker Front-end Electronics, by Belinda Wong-Swanson (LANL), PHENIX FEE Mini-TAC, Brookhaven National Laboratory, June 10-11, 1998.
- Muon Tracking FEE Cost Redution Efforts, by W. Wayne Kinnison (LANL), PHENIX Collaboration Meeting, Tokyo, Japan, December 6-8, 1997. PDF
- Action Items from Recent Muon Arms and Detector Council Meeting, by W. Wayne Kinnison, LANL Weekly Muon Tracking Meeting, September 23, 1997. PDF
- Muon Arms Review Preparation by W. Wayne Kinnison (LANL). Presented at the PHENIX Collaboration Meeting held at BNL, January 12, 1996.
- Beam-Gas Interactions and Their Effect on the Level 1 Trigger of PHENIX by Paul Kirk (LSU). Presented at the Luminosity Workshop held at BNL, July 17-19, 1995.
- New Thoughts on Muon ID Design and Performance by P. L. McGaughey and J.M. Moss. Talk Presented by P.L McGaughey at ORNL on 5/23/95 at the PHENIX Muon Arm Meeting
to PHENIX Home Page
to PHENIX Muon Subsystem Home Page
WebmasterLos Alamos
Last Updated: Wednesday, November 18, 1998