PHENIX MUON TRACKING

Station 1 Prototype Assembly


Note: These are preliminary drawings only and have not been designated for construction. They were last updated 11/9/95.
  • 22.5 Degree Rib, Dowel, Thd Rod
  • 45 Degree Rib and Cover
  • Cathode Geometry
  • Frame Subassembly Machine Drawing
    up to PHENIX Home Page up to PHENIX Muon Subsystem Home Page
    Last updated: 11/14/95
    Send Mail to:Webmaster

    Los Alamos National Laboratory