FVTX
Home Page
Operation/Maintenance/Commissioning
Project Management
Meetings and Presentations
Software
Database
Wedge Hardware
DAQ
BNL Assembly
Power and Grounding
Mechanics
Integration
Contact Info
FVTX Assembly at BNL
General Assembly Information:
All BNL Assembly Workers in
Physics
must Read and Sign:
Experimental Safety Review
All BNL Assembly Workers in
Chemistry
must Fulfill Chemistry Training
requirements
Sign up for, view On-site workers at BNL Assembly
View the ELOG
Assembly procedures etc.
Replacing a Wedge on a Disk
Reinforcing cracked fiber connectors
Wedge power pigtails
Damage to tranceivers
on the ROC boards
ROC heat damage
Various DAQ instructions/trouble-shooting can be found on the
Wiki
Test fit with the cage copy
The last inch
VTX cable pusher ring
Grounding disk carbon structures
Grounding wedge carbon structures
Constraining the big wheel
VTX/FVTX endplate
Cage Assembly Procedure
Cage Assembly Database
ROC Mounting onto Cooling Plate Procuedure
Disk Assembly Database, Progress Plots
Disk cabling and cage assembly sequence
Metrology: Files
(1).xls
(2).xls
(3).xls
(4).xls
Disk assignments
Routing of the bias cables
Special (dis)-connection tools
The spare wedges in BNL
Attaching pedestals
Replacing a wedge
System Testing:
Spartan-3 Pinout for Clock Distribution
(Excel)
Photos:
See the FVTX
picture collections
Photos of fully assembled NW cage (October 2011)
Assembly Photos from Jeongsu
Small Disk Photos from Hubert
Station 0 extension cable in cage
Last update Thursday, 06-Jan-2022 15:55:12 MST by
Melynda Brooks