hubert's talks under construction
These are the slides I showed during the MVD collaboration meeting of January 1997 at Los Alamos.
alignment issues
the correlation method
pad detectors
summary of criteria
current situation
things to do
analysis of the spring 96 beamtest
picture of the setup
layout of the electronics boards
pre- post- and subtracted signals
signal-to-noise
track stubs
bias voltage and angle dependence
gain studies: vcal runs
laser scan: some channels
summary of laser scan
online software
current DAQ
future DAQ (fall 97)
MVD system test block diagram
to be done
data base management
simulation status
signal-to-noise scaling estimates
Index of other talks I have on the web