MCM 116 timeline
History of MCM 116
- ?-May-99: arrival at LANL, visually inspected
- ?-May-99: at LANL, glue output cable to MCM
- ?-May-99: sent to Pace to install surface mount components, wirebonding, encapsulation
- ?-May-99: some surface mount components fell off (probably, we know they fell off
some in a group of 3 containing this MCM, but do not have more detailed records)
- ?-May-99: "poke-test" on remaining surface mount components
- ?-May-99: sent pack to pace to replace backwards capacitors and re-install
components which fell off. I'm not sure but maybe all components were
pulled off and replaced at this time.
- ?-May-99: visual inspection, no problems reported.
- ?-May-99: no formal QA, but
unofficial QA testing -- no problems were seen.
- 24-Jun-99: at LANL, attached silicon detector via kapton cable
- 24-Jun-99: send to Pace for wirebonding and encapsulation
- 20-Jul-99: sent to Pace to have 4 surface mount caps replaced
- 6-Aug-99: probe surface mount components, no problems, except one row of caps (on TGVs)
"looks like bad contact although survive pull
test". Later judged OK.
- 18/19-Aug-99: MCM QA,
failed -- 5th block of channels doesn't work,
AMU problem?
.
- 27-Aug-99: probe surface mount components, OK? --
there is an incomplete comment
about clear encapsulant on the MCM
surface
- 24/31-Aug-99: Tested with laser station,
failed -- one block of bad channels (and maybe
a few other scattered bad channels -- I do not remember).
.
John Sullivan
updated 15-Sep-1999