MuTr Cathode Strip Run-VI Calibration Results Summary
MuTr Cathode Strip Run-VI Calibration Results Summary
- Procedures for taking muTr calibration data.
- A description of the steps involved in the calibration automatic daq/analysis chain,
and meaning of Fit codes from non-linear fit to each strip.
- Description of the Dallas Chip readout which is run at the end of above.
- Directory with stuck-bit checks on calibration data.
- Directory with Dallas readout web interface.
- Check out the latest status messages:
South :
last modified: Tuesday, 27-Jun-2006 13:50:24 MDT
North :
last modified Sunday, 25-Jun-2006 18:09:12 MDT.
- You too can get emails of errors or sucessful calibrations - put your email in va011:.mailrc
Histograms like below but by PACKET vrs time for pedestals and RMS.
Pedestals vrs Day
| Station-1
| Station-2
| Station-3
|
South
|
|
|
|
North
|
|
|
|
_ RMS vrs Day _
| Station-1
| Station-2
| Station-3
|
South
|
|
|
|
North
|
|
|
|
List of calibrations:
* Analysis results including zero-suppression threshold files are located on va011 in the
phnxmutr account under calib/ in directories named according to the date the
calibration data was taken. Threshold files are in subdirectories of these directories called
"thresh...".
Mike Leitch (leitch@lanl.gov)
David Silvermyr (silvermy@lanl.gov)